The constructors confirm that they will blast the first charge on Thursday Mars 22.

The following is important and should be followed

  • ALWAYS respect directions from workers with VAKT written on the vest.
  • Do not stand in windows and look towards the construction site when the short signals sound before detonation.
  • Signals: short signals will be heard before the detonation and long signals indicates, all clear.
  • Planned detonations: 10.00-10.10 am and 2.00-2.10 pm. Possible detonation at 12:00 pm on Fridays. Note that, detonations can appear up to 10 minutes after the specified detonation time.

The construction site has been granted permission for detonations at 10:00 am, 12:00 pm and 2:00 pm.